Corporate event

Event management software for your corporate event.

A company all-hands, product launch or client event that has to start on time and feel sharp.

  • A starting run of show for a corporate event, 7 cues from doors to close
  • A 8-step planning checklist grouped by workstream, with owners and timing
  • Guests and RSVPs, a budget tracker and vendor management on the same event
  • Live day-of mode so the whole crew follows one run of show

30–300 guests · starts 8:30 AM · runs 2h 40m

event70.com / corporate / run of show
  • 8:30 AMDoors, check-in & coffeesetup · Front of house30m
  • 9:00 AMWelcome & housekeepingsegment · Host / MC10m
  • 9:10 AMLeadership addressspeaker · Exec sponsor30m
  • 9:40 AMProduct / business updatespeaker · Presenter20m
  • 10:00 AMNetworking breakbreak · Catering20m
  • 10:20 AMBreakouts / Q&Asegment · Facilitators40m
  • 11:00 AMClose & next stepssegment · Host / MC10m
What makes a corporate event different

A corporate event is short and watched closely, which is why it goes wrong in small, visible ways rather than big ones. Most run about two and a half hours end to end, from the 8:30 check-in and coffee through a leadership address, a business update, a break, breakouts and a tight ten-minute close. The usual failure is timing, not content. An executive who runs long during the address eats into the networking break, which then eats into breakouts, and the close gets rushed or cut entirely. The fix has less to do with the material and more to do with ownership and buffers: an AV rider confirmed three weeks out, a run of show built and shared a week ahead so front of house, the exec sponsor and the facilitators are all working from the same clock, and a same-day tech check that catches handoff problems before a live room does. A good corporate event feels unhurried to guests even though every transition was planned to the minute.

Run of show

A corporate event that starts on time.

Event70 seeds a 7-cue run of show for a corporate event. Edit the times, owners and content, and the show clock keeps everything aligned on the day.

How to write a run of show
event70.com / events / run of show
  • 8:30 AMDoors, check-in & coffeesetup · Front of house30m
  • 9:00 AMWelcome & housekeepingsegment · Host / MC10m
  • 9:10 AMLeadership addressspeaker · Exec sponsor30m
  • 9:40 AMProduct / business updatespeaker · Presenter20m
  • 10:00 AMNetworking breakbreak · Catering20m
  • 10:20 AMBreakouts / Q&Asegment · Facilitators40m
  • 11:00 AMClose & next stepssegment · Host / MC10m
Planning checklist

8 steps, grouped by workstream.

Every task has a category and timing, so you always know what to lock next in the weeks before the doors open.

LogisticsProgramGuestsProductionCateringOn-site
event70.com / events / checklist
  • Confirm date, venue and headcountLogistics8w before
  • Lock the agenda and speakersProgram6w before
  • Send save-the-date / invitationsGuests6w before
  • Brief AV and confirm tech riderProduction3w before
  • Finalise catering and dietary needsCatering2w before
  • Build the run of show and share itProduction1w before
  • Print signage and name badgesOn-site1w before
  • Run a tech check and rehearsalProductionevent week
FAQ

Frequently asked questions

How far in advance should we plan a corporate event?

For a half-day event like this, eight weeks is a reasonable minimum: enough time to lock the venue and headcount, confirm speakers, and get an AV rider sorted before the final scramble. Bigger leadership events or ones needing travel coordination benefit from starting closer to twelve weeks, but eight is a workable floor for most single-morning formats.

How long should a corporate event run?

Two to three hours is typical for a morning format that includes a leadership address, an update, a break and breakouts. Stretching much past three hours without a meal or a real change of pace tends to lose the room, especially for an internal audience that still has a workday ahead of them.

Who should own the run of show on the day?

One person, usually from production or the events team, not the exec sponsor or the MC. That person holds the master timing, cues each segment owner, and is the one who decides in real time whether to trim the Q&A or hold the close. Without a single owner, small delays compound because everyone assumes someone else is tracking the clock.

Plan your corporate event in Event70.

Start free with this run of show and checklist already in place.

Also explore templates, guides and pricing.